Transportation

- Project: Scudders Falls Bridge
- Customer : DRJTC
- Work Preformed :
- Furnished and installed 12,000 feet of 144-strand fiber optic cable for traffic signals, and roadway ITS equipment.
- Furnished and installed 10,000 feet of 12-strand fiber optic cable for traffic signals, and roadway ITS equipment node locations. ( cameras, VMS signs, tag readers, traffic signals, etc.)
- Furnished and installed fiber optic pigtails and fiber optic termination panels for node location fiber optic cable termination.
- Furnished and installed fifteen fiber optic splice enclosures for node equipment tie-ins to the backbone fiber optic cable.
- Furnished as-built drawings, bi-directional OTDR testing, and test reports at the completion of the project.

- Project : Ben Franklin Bridge
- Customer : DRPA
- Work preformed :
- Furnished and installed 59,000 feet of 24 strand ABF cable for SCADA equipment, lighting devices and ITS equipment .
- Furnished and installed 22,000 feet of 12 strand ABF cable for SCADA equipment, lighting devices and ITS equipment.
- Furnished and installed 2,000 SM/APC splice-on connectors for the cable termination.
- Furnished and installed eight fiber optic splice enclosures.
- Furnished as-built drawings, bi-directional OTDR testing, and test reports at the completion of the project.
- Furnished a 20-year system warranty.

- Project : Walt Whitman Bridge
- Customer : DRPA
- Work Preformed :
- Furnished and installed 25,000 feet of 24 strand ABF cable for SCADA equipment, lighting devices and ITS equipment.
- Furnished and installed 2,000 SM/APC splice-on connectors for the cable termination.
- Furnished and installed fifteen fiber optic splice enclosures.
- Furnished as-built drawings, bi-directional OTDR testing, and test reports at the completion of the project.
- Furnished a 20-year system warranty.